3.7 Reports
3.7.1 Design Reports and Studies
A draft, draft-final, and final Engineer’s report is required for all FAA reviewed and funded projects. For all non-FAA projects, verify with the MDOT MAA Project Manager during the proposal preparation phase if an Engineer’s report is required for the project. All Engineer’s reports shall be marked as “draft” until approved by the MDOT MAA Project Manager. Once approved by the MDOT MAA Project Manager, the final report shall be issued.
All design reports and studies shall follow the format shown in the standard template available in AIRPortal under General > PEGS Reference Documents. Template is available in 8.5x11 and 11x17 format and includes:
A. Cover page
B. Table of Contents
C. Section I. Executive Summary
D. Section II. Design/Study Report
E. Section III. Appendices – Appendices include, but not limited to, meeting minutes, review comments and responses, cost estimate, exhibits, geotechnical report.
F. Section IV. Design Report General Information
3.7.2 Geotechnical Reports
When a geotechnical study is included in the scope of work for projects at BWI Marshall or Martin State Airports, the consultant shall submit the final geotechnical report as outlined below. Geotechnical investigations shall be performed in accordance with PEGS V2, Chapter 6.1.3 Geotechnical Investigations.
3.7.2.1 Hardcopy Submission
The final Geotechnical Report shall be submitted to the MDOT MAA Project Manager as an appendix to the Engineer’s Report.
3.7.2.2 Digital Submission
Refer to PEGS V1, Chapter 1.4.2.2.A, Geotechnical Reports.
3.7.3 Stormwater Management Reports
Refer to PEGS V1, Chapter 1.4.2.2.B, Stormwater Management Reports.